Calculate OEE, Cycle Time, Takt Time, Downtime Cost, Scrap Rate, DPMO, Throughput and Line Balancing — the gold-standard tools for measuring and improving manufacturing productivity.
📊OEE
⏱Cycle Time
🎯Takt Time
💰Downtime Cost
♻️Scrap Rate
σDPMO / Six Sigma
🔄Throughput
⚖️Line Balancing
OEE Calculator
Overall Equipment Effectiveness — the gold standard for measuring manufacturing productivity. OEE = Availability × Performance × Quality.
minutes
minutes
seconds per piece
pieces
pieces
OEE Results
OEE Score
—
%
Availability
—
%
Performance
—
%
Quality
—
%
OEE Score
Formulas: Availability = Run Time / Planned Time | Performance = (Ideal CT × Total Pieces) / Run Time | Quality = Good Pieces / Total Pieces | OEE = A × P × Q
Cycle Time Calculator
Cycle Time is the total time from the beginning to the end of your process. Calculate average cycle time and production rate.
minutes per shift
pieces per shift
Cycle Time Results
Cycle Time
—
seconds / piece
Cycle Time
—
minutes / piece
Production Rate
—
pieces / hour
Formula: Cycle Time = Net Production Time / Units Produced
Takt Time Calculator
Takt Time is the rate at which products must be produced to meet customer demand. It sets the heartbeat of your production line.
minutes per shift
units per shift
Takt Time Results
Takt Time
—
seconds / unit
Takt Time
—
minutes / unit
Required Rate
—
units / hour
Formula: Takt Time = Available Production Time / Customer Demand
Downtime Cost Calculator
Calculate the true cost of unplanned downtime, including lost revenue, labour costs, and recovery expenses.
hours
units / hour
₹ or $ per unit
₹/$ per hour (total)
₹/$ per hour
Downtime Cost Results
Total Downtime Cost
—
₹ / $
Lost Revenue
—
₹ / $
Labour Cost
—
₹ / $
Overhead Cost
—
₹ / $
Units Lost
—
pieces
Cost / Minute
—
₹ / $
Formula: Total Cost = Lost Revenue + Labour Cost + Overhead Cost | Lost Revenue = Duration × Rate × Revenue/unit
Scrap Rate Calculator
Calculate scrap rate, yield, and the cost impact of defective units in your production process.